yianis Beginner
Joined: 16 Jan 2006 Posts: 1 Topics: 1
|
Posted: Mon Jan 16, 2006 8:53 am Post subject: SAR XCODE question |
|
|
A job has multiple steps. In step 2 the job allows a return code of 8.
When the job runs, step 2 has a return code 8 and step 5 further down has a return code 4.
In SAR, the XCODE on the panel displays the return code 4. I assume this is because it takes the latest return code from the job.
Does anyone know why that is ?
Is there somewhere (i guess) during installation of the product that it would have an option (or default) to display the latest return code or the highest one? |
|