View previous topic :: View next topic |
Author |
Message |
deepatred Beginner
Joined: 29 Nov 2005 Posts: 19 Topics: 6
|
Posted: Wed Jan 03, 2007 1:25 am Post subject: JOBTRAC:Schedule a job based on return code of previous job |
|
|
Hi,
We have a requirement to schedule a job based on the retun code of previous job, is this possible in JOBTRAC?
For eg:
Job1 --> Job2 ---> Job3 ---> Job4
Now Job1 has a last step which returns a code 5 if a file is empty and 2 if not empty.
So if return code of Job1 is 5 we want the schedule to be
Job1 ---> Job4 i.e. skip Job2 and job3
Is this possible in jobtrac?
Thanks |
|
Back to top |
|
 |
dbzTHEdinosauer Supermod
Joined: 20 Oct 2006 Posts: 1411 Topics: 26 Location: germany
|
Posted: Sun Jan 14, 2007 4:39 am Post subject: |
|
|
this kind of activity is almost a prerequisite for a scheduler.
since jobtrac is at your site, you should have documention, suggest you read it and determine how.
why do you not ask your operations dept? _________________ Dick Brenholtz
American living in Varel, Germany |
|
Back to top |
|
 |
|
|